Reclamation increases Central Valley Project 2023 water supply allocations

  • by Bureau of Reclamation
  • Mar 28, 2023
  • Water News

SACRAMENTO – Today, the Bureau of Reclamation announced an increase in Central Valley Project 2023 water supply allocations. After below average precipitation in February, Reclamation announced a conservative initial water supply allocation for the CVP on Feb. 22. Additional atmospheric river systems have since boosted hydrological conditions and storage volumes, allowing for a more robust water supply allocation.

Since making initial allocations last month, Shasta Reservoir, the cornerstone of the Central Valley Project, has increased from 59% to 81%, and San Luis Reservoir, the largest reservoir south-of-Delta, from 64% to 97%. Record-breaking snowpack conditions currently exist in the Southern Sierra coupled with significant snowpack in the Central Sierra and Northern Sierra/Trinity.

Based on current hydrology and forecasting, Reclamation is announcing the following increases to CVP water supply allocations:

North-of-Delta Contractors

Irrigation water service and repayment contractors north-of-Delta are increased to 80% from 35% of their contract total.

Municipal and industrial water service and repayment contractors north-of-Delta are increased to 100% from 75% of their historic use.

South-of-Delta Contractors

Irrigation water service and repayment contractors south-of-Delta are increased to 80% from 35% of their contract total.

M&I water service and repayment contractors south-of-Delta are increased to 100% from 75% of their historical use.

Friant Division Contractors

Friant Division contractors’ water supply is delivered from Millerton Reservoir on the upper San Joaquin River and categorized by Class 1 and Class 2. The first 800,000 acre-feet of available water supply is considered Class 1; Class 2 is considered the next amount of available water supply up to 1.4 million acre-feet. Class 1 remains at 100% and Class 2 was previously increased from 20% to 70% on March 7.

Friant Dam is currently being operated for flood control purposes; as long as these conditions exist contractors are able to take delivery of all available water from Friant Dam to the maximum extent of their respective contracts.

All other CVP water supply allocations remain the same as noted in the Feb. 22 announcement.

As the water year progresses, changes in hydrology, actions that impact operations, and opportunities to deliver additional water will influence future allocations. Reclamation will continue to monitor hydrology and may adjust basin-specific allocations if conditions warrant an update. Water supply updates and past year’s allocations are posted on Reclamation California-Great Basin Region’s website.

Suggested Resources

15 RESOURCES prev next
Comment Letter: 2025-26 State Budget: Climate Bond Implementation

To: President pro Tempore McGuire, Speaker Rivas, Budget Chairs Weiner and Gabriel, and Subcommittee Chairs Allen and Bennett Subject: 2025-26 […]

Regulatory Roundup

The following document is released each month and includes policy updates from ACWA’s Regulatory Department. Click on the below link […]

Coalition Letter: Comments on the Draft Guidelines for Recovery Planning

Agency: California Department of Fish and Wildlife, Wildlife Branch, Attn: Austin Roy/Recovery Guidelines Subject: Comments on the Draft Guidelines for […]

Comment Letter: U.S. Department of Agriculture: NEPA Implementing Regulations—Docket No. USDA–2025–0008

To: Scott Vandegrift, Office of the Secretary, U.S. Department of Agriculture Subject: U.S. Department of Agriculture: NEPA Implementing Regulations— Docket […]

Comment Letter: ACWA Comment Letter regarding Draft Intended Use Plans for the Drinking Water State Revolving Fund Fiscal Year 2025 – 2026

To: Courtney Tyler, Clerk to the Board, State Water Resources Control Board Subject: Draft Intended Use Plans for the Drinking […]

Coalition Letter: Wildfire Solutions Coalition Supports Reauthorizing Cap-and-Trade Program and Increased Investment in Wildfire Resilience and Other Nature-Based Climate Solutions

To: President pro Tempore Mike McGuire, Speaker Robert Rivas, Senators Benjamin Allen, Catherine Blakespear, Monique Limón and Assemblymembers Steve Bennett, […]

Comment Letter: U.S. Department of the Interior: Regulatory Reform—Docket No. DOI–2025–0005

To: Gregory Zerzan, Acting Solicitor, U.S. Department of the Interior Subject: U.S. Department of the Interior: Regulatory Reform—Docket No. DOI–2025–0005 […]

Comment Letter: U.S. Environmental Protection Agency: NDWAC proposed revisions to the PFAS National Primary Drinking Water Regulation — Docket ID No. FRL–12882–01–OW

To: Tracey Ward, U.S. Environmental Protection Agency, Office of Ground Water and Drinking Water Subject: U.S. Environmental Protection Agency: NDWAC […]

Comment Letter: U.S. Army Corps of Engineers: Proposal To Reissue and Modify Nationwide Permits—Docket No. COE-2025-0002

To: Lieutenant General William H. “Butch” Graham, Jr., U.S. Army Corps of Engineers Subject: U.S. Army Corps of Engineers: Proposal […]

Priority Issues Bulletin

Sorry, but only ACWA members have permission to view this content. Member login is required.

Coalition Letter: FY 2025 – 2026 Budget – Support for AB 102 and SB 102 – Funding for the Agreements to Support Healthy Rivers and Landscapes

To: President pro Tempore McGuire, Speaker Rivas, Budget Chairs Weiner and Gabriel, and Subcommittee Chairs Allen and Bennett Subject: FY […]

Coalition Letter: Dam Safety and Resilience Program – Updated Request for 2024/25 Budget Funds and Allocation of Proposition 4 Monies

To: Governor Newsom, Policy Chairs and Budget Subcommittee Chairs Subject: Dam Safety and Resilience Program – Updated Request for 2024/25 […]

Coalition Letter: 2025-26 Budget – Oppose Proposed Reduction of Funding for the Agreements to Support Healthy Rivers and Landscapes

To: President pro Tempore Mike McGuire, Speaker Robert Rivas, Budget Chairs Scott Weiner and Jesse Gabriel, and Subcommittee Chairs Benjamin Allen […]

Cross-Connection Control Toolkit

Sorry, but only ACWA members have permission to view this content. Member login is required.

Comment Letter: Updated Water Measurement and Reporting Revisions

To: Courtney Tyler, Clerk to the Board, State Water Resources Control Board Subject: Updated Water Measurement and Reporting Revisions Letter […]

Suggested News

15 Articles prev next
ACWA Election Ballots Are Out, Voting Closes Sept. 19

ACWA member agencies’ authorized voters received an electronic ballot July 21 to vote for the ACWA President, Vice President and […]

ACWA Launches Official YouTube Channel

The Association of California Water Agencies (ACWA) is pleased to announce the launch of its official YouTube channel, a new platform […]

Experimental Hatchery Strays Find Suitable Habitat and Cold Water on the Tuolumne

LA GRANGE – In an exciting and unexpected conservation success, 1,200 adult spring-run Chinook salmon—originally released as part of the […]

District Earns Distinguished Financial Award for 17th Year

MARINA— Once again, the Marina Coast Water District has been recognized for outstanding financial stewardship—earning the Certificate of Achievement for […]

DWR Accepting Comments on Draft Subsidence Management Document

SACRAMENTO – For almost a century, parts of California have been gradually sinking, impacting critical infrastructure and the communities who […]

July 25, 2025 ACWA News Available

Read the June 27 edition of ACWA News for informative articles about the association and water industry. Articles include: ACWA Staff Organizes Educational […]

Mojave Water Agency celebrates 65 Years of Service

APPLE VALLEY — In tribute to six and a half decades of service, the Mojave Water Agency (MWA) hosted a […]

Projects Aligned with Healthy Rivers and Landscapes Program Producing Results

ACWA has long supported the Healthy Rivers and Landscapes (HRL) Program as the preferred pathway for updating the state’s Bay-Delta […]

Help Build California Water’s Future, Apply to Serve on an ACWA Committee

Now is the time to apply for an ACWA committee, where collaboration leads to real impact across California’s water sector. […]

ACWA Responds to Revised Draft Bay-Delta Plan Update

SACRAMENTO — The Association of California Water Agencies (ACWA) today issued a statement from Interim Executive Director Marwan Khalifa regarding […]

PWD Mourns Passing Of Board Director Vincent Dino

PALMDALE – It is with a heavy heart that Palmdale Water District (PWD) announces the unexpected passing of Board Director […]

ACWA Committee Appointment Process Under Way for the 2026-’27 Term

ACWA members interested in serving on one of ACWA’s 13 standing committees may apply now through Sept. 19. ACWA’s committees […]

BCVWD Recognized for Excellence in Financial Management and Technology

BEAUMONT — The Beaumont-Cherry Valley Water District (BCVWD) continues to demonstrate leadership in financial transparency and innovation, having been recognized […]

Agency Recognized for Enduring Impact on Inland Empire Youth

BEAUMONT – The SoCal STEAM Challenge has recognized the San Gorgonio Pass Water Agency (SGPWA) for 15 years of transformative […]

Improved Water Availability Raises Bond Rating To ‘AA-‘ for Montecito Water District

S&P Global Ratings announced the long-term rating on Montecito Water District California’s series 2020A water revenue refunding bonds increased to […]